Arenes

EmployerOZYAZICI CONSTRUCTION LocationANKARA Project Area106,000 m2 Year2023 - 2024 Installed Power6 MVA About Project In this project, designed in the form of a 5-armed star, each arm creates a special architectural structure representing a different institution. In the north direction, the Supreme Institution block is located together with cultural institutions such as the Turkish Language Association and the Turkish Historical Society. In the south, there is the Ataturk Culture Center and the Ataturk Research Center. Social facilities such as a congress center for 1000 people, a large cafeteria, library, foyer, and exhibition areas are offered at the facility. The installation and commissioning of all 36 kV Medium Voltage (MV) systems, 0.4 kV Low Voltage (LV) systems, and low current systems of this project have been successfully completed by our group on a turnkey basis. Our group has signed a work at high engineering standards by providing security, efficiency, and modern infrastructure to this prestigious project.