EmployerDİEM MÜHENDİSLİK MİMARLIK A.ŞLocationANKARAProject Area10,000 m2Year2019Installed Power1.6 MVAAbout The Project
The new factory, established as an addition to DOĞADAN's existing production facility in Akyurt, Ankara (a subsidiary of COCA COLA), is equipped with the latest technology and carries out the processing, drying, and packaging of tea leaves in accordance with high quality standards. This modern facility, where green and black teas are produced in addition to herbal and fruit teas, has been a significant investment to increase the production capacity of DOĞADAN, the market leader in the Herbal and Fruit Tea segment.
The installation and commissioning of all 36 kV MV, 0.4 kV LV, and low voltage systems for this additional facility were successfully completed by our group on a turnkey basis. We are proud to contribute to DOĞADAN's production efficiency and quality standards with the engineering solutions we provide.