ClientOYAK RENEWABLE ENERGY INC. LocationSivas Project Area424,000 m2 Year2025 Installed Power34.6 MVA About the Project The 34.6 MVA Solar Power Plant (SPP) project implemented by Erdemir Mining Industry and Trade Inc. (ERMADEN), one of Turkey’s largest iron ore producers operating under OYAK Mining and Metallurgy Group, is being carried out under the leadership of OYAK Renewable Energy Inc., with turnkey implementation works executed by ARENES Electrical Industry and Trade Inc. Within the scope of this land-based project; power plant installations, a 7.8 km 145 kV energy transmission line, a 154 kV 25 MVA redundant switchyard, transformer substations, energy transmission lines, SCADA infrastructure, and all electrical and mechanical works are successfully carried out by our company. With this investment, ERMADEN meets its energy needs through renewable sources while optimizing production costs and reducing carbon emissions, establishing an environmentally friendly production model. As ARENES, we are pleased to contribute to this transformation led by OYAK Renewable Energy Inc.