Arenes

ClientDİEM MÜHENDİSLİK MİMARLIK A.Ş LocationManisa Project Area5,500 m2 Year2020 Installed Power2.5 MVA About the Project PepsiCo's new additional facility established in Manisa, one of the world’s leading food producers, has a total indoor area of 5,500 m² and is equipped with modern production technologies and automation systems to increase efficiency and maintain the highest quality standards. In addition to the Turkish market, the facility also meets the demands of the Middle East and Asian markets, producing iconic brands such as Lay’s, Doritos, Ruffles, and Cheetos. The installation and commissioning of all 0.4 kV LV systems, weak current systems, and industrial automation systems related to the PEPSICO / FRITO LAY FACTORY additional facility were successfully completed by our group on a turnkey basis. With our engineering solutions, we are proud to elevate PepsiCo’s production efficiency and safety standards to the highest level.